冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應(yīng)根據(jù)設(shè)備的各種條件,考慮其安裝位置的地面及其荷載能力,同時(shí)也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時(shí)應(yīng)注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預(yù)埋好水平鋼板,各基礎(chǔ)點(diǎn)的標(biāo)高應(yīng)在同一標(biāo)高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應(yīng)放置水平。水塔在施工安裝時(shí),為防止壓壞底盤(pán),施工人員應(yīng)踏在底盤(pán)的加強(qiáng)筋上,在安裝塔外殼、底盤(pán)等纖維件時(shí),為防止外殼底盤(pán)等變形可先穿螺釘,而后依次逐漸緊固,在確認(rèn)底盤(pán)不變形,附近干凈、干燥的條件下,為避免使用時(shí)漏水可在接觸處鋪設(shè)纖維氈及涂樹(shù)脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風(fēng)不良和出現(xiàn)濕空氣回流的場(chǎng)合,須安裝在通風(fēng)良好的場(chǎng)所。否則將會(huì)降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤(pán)向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時(shí),應(yīng)根據(jù)施工圖指明的坐標(biāo)位置就位,并應(yīng)找平找正,設(shè)備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應(yīng)正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
午夜电影网亚洲一区| 欧美人人曰人人操| 人妻视频久久久| 亚洲国产日韩欧美性爱| 台湾娱乐中文网偷拍自拍| 国产91/欧美| 欧美影院 亚洲| 亚洲天堂在线8| 亚洲人激情网站| 日本欧美A∨一区二区| 色五月丁香啪啪啪啪| 欧美丰满日韩| 人妻熟女偷拍视频| 9.1后入视频| 麻豆人妻一区二区三区66| 亚洲精品电影麻豆AV| 美女狂扒逼逼给男人看| 日本人妻深喉一区二区| 你懂的资源在线麻豆| 久久图片小说一区| 亚洲 精品 日韩 欧美| 爱操免费视频| 美女被操视频资源| 欧亚精品偷啪一二区| 麻豆一区二区hh| 伊人青青草91视频| 少妇av剧情| 青青草无码国产专区在免费| 中文字幕人妻激情| 91成人福利| 欧美精品午夜在线观看成人| 久久久老湿网| 亚洲久久一区二区视频| 木林宝库不卡一区二区三区| 久久免费视频www| 国产 日韩欧美 精品| WW国产com| 久久网络视频女| 大鸡巴欧美性| 日韩三级午夜激情考逼| 久久久久日本精品久久|